Imagine × 7-Eleven

TwoDecadesofPartnership.OneRelentlessCommitmenttoExcellence.

How Imagine continuously engineers cost, materials, accuracy, production, talent and creative innovation into the 7-Eleven program.

Accepted 2025 savings
$0.000M
Annualized operational savings
$0.000M
Stores migrated on schedule
0+
Kit accuracy to stores
0.0%
7-Eleven storefront windows with printed promotional banners and posters
01Chapter

Cost Reduction and Continuous Value Engineering

Savings as a discipline, not a one-time exercise.

5 opportunities · reveal how Imagine responded to each.

Opportunity01 / 05

The scale of the program makes even small material, size and freight inefficiencies expensive.

$0.000MAccepted 2025 savings through P5
$0.000MMaterials, profile efficiencies & other initiatives
$0.000MAnnualized operational savings identified

Imagine Response

Established an ongoing cost-out discipline rather than treating savings as a one-time procurement exercise. The 2025 QBR reports $11.835M in accepted 2025 savings through P5, including the contractual rebate plus $1.932M from materials, profile efficiencies and other initiatives. The same report estimates the identified 2025 operational initiatives at $3.146M in annualized savings.

Opportunity02 / 05

Marketing components were larger and more expensive than necessary.

$0Window banner resize, 2025 savings
$0Large-window banner reduction, 2025
$0Estimated annually
Opportunity03 / 05

Kit dimensions were triggering avoidable oversized-carton freight charges.

$0Across three direct-to-store campaigns
$0.0MAnnualized freight savings
Opportunity04 / 05

Kit overages were creating unnecessary production and material expense.

$0Estimated 2025 savings
$0Annualized
Opportunity05 / 05

Shelf-tag material carried unnecessary unit cost.

$0Saved during 2025
$0Annually
7-Eleven branded bottled drinks display in store
02Chapter

Material and Packaging Innovation

Smarter materials, smaller kits, real sustainability.

4 opportunities · reveal how Imagine responded to each.

Opportunity01 / 04

Marketing materials needed to fit into smaller, more efficient kits without compromising execution.

Imagine Response

Changed window-banner stock from 20 mil styrene to 10 mil Transpaque and changed Coroplast pole-sign scoring from halves to thirds. Both were cost-neutral at the component level but enabled smaller kit cartons, unlocking logistics efficiency.

Opportunity02 / 04

7-Eleven needed continued sustainability progress without adding cost.

Opportunity03 / 04

Remodel décor needs premium-looking architectural finishes without forcing every location into premium-material economics.

Opportunity04 / 04

Remodel finishes need a repeatable family of durable materials that installers can reliably specify and deploy.

7-Eleven store aisle with hanging promotional signage and shelf tags
03Chapter

Marketing Kit Accuracy at Massive Scale

Three programs. One workflow. Zero stores missed.

3 opportunities · reveal how Imagine responded to each.

Opportunity01 / 03

The Speedway acquisition left 7-Eleven with three separate signage programs, different sales processes, loyalty platforms, sign sizes/substrates and vendors.

0Signage programs before
0Unified promotional workflow

Imagine Response

Consolidated 7-Eleven, Speedway and Stripes from three programs into one, rationalizing sign types, sizes and substrates and creating a single promotional workflow.

Opportunity02 / 03

Historical program and store-profile data had to be migrated from the outgoing supplier without missing a fixed production date, and bad data could translate directly into wrong kits.

0+Stores brought onto one program
0Stores left without a kit
Opportunity03 / 03

Multiple support processes created confusion for stores, merchants and category teams.

Large-format print production floor with wide-format printers
04Chapter

Production Excellence and Scalable Execution

A network, not a bottleneck.

4 opportunities · reveal how Imagine responded to each.

Opportunity01 / 04

Remodel production had become overly dependent on Chicago, limiting responsiveness and available capacity.

Imagine Response

Restructured the model specifically to distribute production across Imagine locations. The leadership plan states that removing the Chicago dependency would improve responsiveness, capacity and support; new-store construction was subsequently directed to transition from Chicago to Charlotte.

Opportunity02 / 04

Production-grid creation was manual, knowledge-dependent and taking most of a day per remodel store, an approach that could not scale to hundreds of Hoth and DFW locations.

~0%Grid complete before Production touches it
0.0 hrsMax Production review per store (target 1–1.5)
Opportunity03 / 04

Critical remodel knowledge lived with individuals, creating continuity and scaling risk.

Opportunity04 / 04

Manual copying and re-keying create preventable production errors.

Creative and account team collaborating in a modern studio
05Chapter

Account Structure, Critical Hires and Expanded Teams

Clear ownership. Specialized talent. Fewer touchpoints.

5 opportunities · reveal how Imagine responded to each.

Opportunity01 / 05

7-Eleven specifically expressed frustration with communication and program management, including too many people communicating with the client.

Imagine Response

Redesigned the décor account around a small leadership structure with Andy House, Brittiny Lenz and Meridyth Walston, creating clearer ownership and funneling Sales, Production and Installation communication through a consistent leadership team.

Opportunity02 / 05

Remodel execution lacked clear end-to-end ownership.

Opportunity03 / 05

The account needed stronger creative capacity dedicated specifically to 7-Eleven.

Opportunity04 / 05

The overall 7-Eleven account requires specialized expertise rather than generic account coverage.

Opportunity05 / 05

Rapid growth required stronger executive visibility and cross-functional intervention when the program encountered issues.

7-Eleven hot food bar with Made Right Here signage
06Chapter

Creative Leadership and the Next Generation of the Remodel

Beautiful, manufacturable and built for real stores.

4 opportunities · reveal how Imagine responded to each.

Opportunity01 / 04

The existing décor experience needed to feel more energetic, food-forward and culturally relevant while still functioning across very different store footprints.

Imagine Response

Imagine's Embellish redesign initiative is creating a scalable décor and lighting strategy across large, traditional and difficult store layouts, with particular attention to hot foods, checkout, beverage/vault, wayfinding, ceilings, lighting and branded focal points.

Opportunity02 / 04

7-Eleven needs innovation that can scale to different investment levels rather than a single expensive prototype.

Opportunity03 / 04

Hot & Fresh, Fresh to Go and Cold Drinks weren't creating distinctive enough moments in the store.

Opportunity04 / 04

Remodel innovation has to survive real convenience-store operations, not simply look good in renderings.

The Bigger Value Proposition

The Imagine Difference

More than a print vendor. A continuous-improvement and innovation partner across economics, creative, materials, data, production, logistics and store execution.

  • 01

    Take cost out without taking value out.

  • 02

    Engineer smarter materials instead of simply negotiating cheaper ones.

  • 03

    Reduce freight through smarter design, packaging and component sizing.

  • 04

    Turn sustainability into commercially viable material substitutions.

  • 05

    Protect kit accuracy even through major acquisitions and data migrations.

  • 06

    Consolidate fragmented programs, suppliers and processes into one accountable operating model.

  • 07

    Scale production across the Imagine network instead of allowing one facility to become a constraint.

  • 08

    Build specialized account, design, engineering, PM and field-services talent around the client's needs.

  • 09

    Replace tribal knowledge and manual production processes with structured, validated systems.

  • 10

    Create clearer client ownership and fewer communication touchpoints.

  • 11

    Design décor solutions around multiple investment tiers so innovation becomes scalable.

  • 12

    Bring creative innovation and production engineering together early, so concepts are beautiful, manufacturable, durable, maintainable and installable.

  • 13

    Solve at enterprise scale: 4,000+ stores migrated, three sign programs consolidated to one, a fixed production deadline met, and zero stores left without kits during the Speedway/Stripes transition.

  • 14

    Continuously reinvest in the program rather than waiting for 7-Eleven to ask for improvements, as demonstrated by ongoing material, packaging, sustainability, production-grid, staffing and creative initiatives.